Customization: | Available |
---|---|
After-sales Service: | on Site Installation Service |
Condition: | Used |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
CY F series Single Rail Reflow Oven Technology Parameters | ||||
Model | CY-F820 | CY-F1020 | CY-F1220 | |
Heating Zones | Up 8 Down 8 | Up 10 Down 10 | Up 12 Down 12 | |
Cooling Zones | Up 2 Down 2(Standard) Up 3 Down 3(Optional) | |||
Heating Zone Length | 2900mm | 3600mm | 4400mm | |
PCB Max Width | Rails Type 50-450mm/ Mesh belt type 550mm | |||
Transort Direction | Standard L-R or R-L Optional | |||
Guide rail fixed way | Front or Backend(optional) | |||
Conveyor belt height | Mesh belt 875±20mm/ Chain 900±20mm | |||
Transmission way | Chain drive+mesh drive | |||
Conveyor belt speed | 300-2000mm/min | |||
Power Supply | 5-wire 3-phase 380V 50/60Hz | |||
Starting Power | 35kw | 48kw | 68kw | |
Normal working power | 7.5kw | 8.5kw | 10kw | |
Heating up time | About 15-20Mins | |||
Temperature Control range | Room temperature-300ºC | |||
Temperature Control mode | Fully Computerized PID closed-loop control, SSR driver | |||
Machine control Mode | Computer+PLC | |||
Temperature conrol precision | ±1ºC | |||
The deviation of PCB temperature distribution | ±1-2ºC | |||
Cooling way | Air machine: air-cooled | |||
Abnormal Alarm | Abnormal temperature(ultra-high temperature or ultra low after constant temperature) | |||
Three color light | Tri color siginal light: Yellow0-heating up; Green-constant temperature; Red-Abnormal | |||
Weight | Approx 1700kg | Approx 1900kg | Approx 2100kg | |
Installation dimensions | 5050*1400*1450mm | 5750*1400*1450mm | 6480*1400*1450mm | |
Exhaust air requirements | 10 cubic / min 2 channel ∮ 200mm |
Q: What's your main service?
A: We provide total SMT machines and soluton service, professional technology support and after
sales.
Q: Are you a trade company or a manufacture?
A: We are an experienced manufacturer of SMT and PCBA equipment, OEM & ODM
service are available.
Q: What is your delivery date?
A: The delivery date is about 35 days after receipt of payment.
Q: What isyour payment terms?
A: 30% deposit in advance and 70% balance before shipment.
Q: Can you provide a whole line solution?
A: Yes,We can supply SMT line, Coating line, DIP line and LED production line